Take a look at the timeline below to see how you can go from blasted steel to a fully protected and ready-to-transport steel section in an eight hour shift.
Steel beam arrived in shop ahead of the FX6002 application.
Steel beam is safely moved to begin the FX6002 application.
The user-friendly installation system means that FX6002 can be applied quickly.
FX6002 presents a smooth and homogeneous film and will dry hard in one hour.
Accurate dry film thickness measurement is possible as fast as one hour after application.
For demanding fire scenarios higher thicknesses may require a second coat.
Two hours after the final coat application, a FX6002-coated beam can be moved.
FX6002’s hard dried film can resist damage during transportation, handling and erection.
By the end of the shift, FX6002-coated steel can be safely on the way to site.