Achieve more in less time with FX6002

FX6002 has transformed cellulosic passive fire protection. The easy-to-use installation system ensures high quality application and enables you to minimise downtime, reduce bottlenecks and complete projects faster than ever before.
With FX6002 you can benefit from:

Enhanced productivity | Reduced bottlenecks | Minimal downtime

Blink and you’ll miss it

Take a look at the timeline below to see how you can go from blasted steel to a fully protected and ready-to-transport steel section in an eight hour shift.


08:00
Start of a working shift

Steel beam arrived in shop ahead of the FX6002 application.

Step 1
Repositioned for applications

Steel beam is safely moved to begin the FX6002 application.

Step 2
Applying FX6002

The user-friendly installation system means that FX6002 can be applied quickly.

Step 3
Full coat drying

FX6002 presents a smooth and homogeneous film and will dry hard in one hour.

Step 4
Dry film thickness control

Accurate dry film thickness measurement is possible as fast as one hour after application.

Step 5
Second coat if needed

For demanding fire scenarios higher thicknesses may require a second coat.

Step 6
Moving the beam

Two hours after the final coat application, a FX6002-coated beam can be moved.

Step 7
Loading for transportation

FX6002’s hard dried film can resist damage during transportation, handling and erection.

16:00
On the way to site

By the end of the shift, FX6002-coated steel can be safely on the way to site.

Project gallery

  • structure
  • windows
  • structure
  • building with people walking in front
  • building with orange and grey architecture
  • building being built
  • building
  • building

Resource centre


Visit our resource centre to view our latest insights, case studies and product data sheets.